East–West
In 2006 Stroytransgaz signed a contract to build a portion of the largest gas pipeline system in India, the 1,386-kilometer East–West gas pipeline. The pipeline is designed to meet growing demand for natural gas in the central, western, and northern states of India. Reliance Gas Transportation Infrastructure Ltd. is the customer for the project.
Stroytransgaz will construct two sections of the pipeline with total length of 298 kilometers and diameter of 48 inches. Its subsidiary STG Engineering will fulfill the complex of work for design and procurement.
Work was completed in 2008.