Molzhaninovka gas turbine power plant

In 2009 Stroytransgaz concluded a general contract for the construction of the first phase of the Molzhaninovka GTPP. Design capacity of the power plant is 220-260 MW of electricity and 380 Gcal/hour of heat per year. 

The project is being implemented under an investment contract with the Government of Moscow for electric and thermal energy supplies to the housing sector in the promising Molzhaninovskiy region of Moscow and  to the Planernaya industrial area, which includes the Prom City Moskva-Sever specialized production district.

The customer for the project is Resad. The project investor is the state corporation Bank for Development and Foreign Economic Affairs (Vnesheconombank).

Stroytransgaz will execute the project on EPC terms. The company will carry out general construction work at the GTPP main building, modular pump station, booster compressor station. It will also assemble auxiliary and service, and transportation facilities, laid engineering networks. Technical equipment installed in the plant will meet the latest requirements and standards, in particular, a gas turbine and steam condensing turbine plant manufactured by Alstom Power.

In August 2009 Stroytransgaz has completed the first phase of the project. Air transmission lines and fiber-optic communication lines have been reconstructed, transferred from the GTPP construction site, and set in operation. Work is expected to be completed in 2012.