Arab Gas Pipeline, Phase 1
In 2005 Stroytransgaz and the Syrian Gas Company signed a contract on EPC terms to realize construction of the Arab Gas Pipeline in Syria.
The gas pipeline, 320 kilometers in length with diameter of 36 inches, runs from the Jordanian-Syrian border to the Al Rayan gas gathering station in the area of Homs. The pipeline transports gas to electric power generating plants and the country’s gas-distribution network.
Stroytransgaz fulfilled construction obligations on EPC terms. STG Engineering handled the complex of work for design and procurement. The project provides for constructing the line part of the pipeline, including four launcher and receiver traps and 12 line valve stations, a measuring gas unit, as well as installation of a SCADA system, systems for gas leak detection and fire safety, CP, automatic control instrumentation, and telecommunications equipment.
The project has been completed in 2008.