TURKMENISTAN

Current projects

  • Malai-Bagtyyarlyk gas pipeline

 

Malai-Bagtyyarlyk gas pipeline

Stroytransgaz concluded the EPC contract for construction of the Malai-Bagtyyarlyk in Turkmenistan in 2008. Customer—state-owned Turkmengaz.

Work includes engineering, procurement and construction of units for gas drying, a pay-as-you-go metering unit, and the Malai-Bagtyyarlyk’s linear pipeline (length 184.54 kilometers, diameter 1420 millimeters):

  • Launcher and receiver stations for cleaning units
  • Seven line linear valve units
  • A 2.2-kilomter beam crossing of the Amudar’ya River
  • Five road and railroad crossings
  • Two helicopter pads
  • 201 kilometers of power transmission lines
  • Fiber-optical communication lines totaling 201.9 kilometers
  • Radio-relay transmission lines
  • Electrochemical protection systems
  • Telemechanical systems (SCADA)
  • A line operational base

According to the contract, work on this project is scheduled to be completed in 2010.