Malai-Bagtyyarlyk gas pipeline
Stroytransgaz concluded the EPC contract for construction of the Malai-Bagtyyarlyk in Turkmenistan in 2008. Customer—state-owned Turkmengaz.
Work includes engineering, procurement and construction of units for gas drying, a pay-as-you-go metering unit, and the Malai-Bagtyyarlyk’s linear pipeline (length 184.54 kilometers, diameter 1420 millimeters):
- Launcher and receiver stations for cleaning units
- Seven line linear valve units
- A 2.2-kilomter beam crossing of the Amudar’ya River
- Five road and railroad crossings
- Two helicopter pads
- 201 kilometers of power transmission lines
- Fiber-optical communication lines totaling 201.9 kilometers
- Radio-relay transmission lines
- Electrochemical protection systems
- Telemechanical systems (SCADA)
- A line operational base
According to the contract, work on this project is scheduled to be completed in 2010.